Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 56662 REL 65: 2009-003-00 EXP UPPER COLUMBIA HABITAT RESTORATION
Project Number:
Title:
Upper Columbia Habitat Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 20.00%
Methow 40.00%
Wenatchee 40.00%
Contract Number:
56662 REL 65
Contract Title:
2009-003-00 EXP UPPER COLUMBIA HABITAT RESTORATION
Contract Continuation:
Previous: Next:
56662 REL 27: 2009-003-00 EXP UCR HABITAT - 2014 WORK 12SEP
  • 56662 REL 88: 2009-003-00 EXP UPPER COLUMBIA HABITAT RESTORATION
Contract Status:
Closed
Contract Description:
This contract will fund the Yakama Nation's, Upper Columbia Habitat Restoration Project to seek, design and implement fish habitat restoration projects throughout the Methow, Entiat, and Wenatchee subbasins for the FY 2015 performance period.
Account Type(s):
Expense
Contract Start Date:
10/01/2014
Contract End Date:
12/31/2015
Current Contract Value:
$4,411,169
Expenditures:
$4,411,169

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Shannon Adams Yakama Confederated Tribes No Technical Contact adas@yakamafish-nsn.gov (509) 945-0754
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Roy Beaty Bonneville Power Administration Yes COR rebeaty@bpa.gov (503) 230-5213
Jason Breidert Yakama Confederated Tribes Yes Technical Contact brej@yakamafish-nsn.gov (509) 860-5351
Chris Butler Yakama Confederated Tribes Yes Technical Contact butlerc@yakamafish-nsn.gov (509) 449-8215
Christopher Clemons Yakama Confederated Tribes Yes Technical Contact clec@yakamafish-nsn.gov (509) 881-5746
Madeleine Eckmann Yakama Confederated Tribes No Technical Contact eckm@yakamafish-nsn.gov (509) 449-2091
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Jarred Johnson Yakama Confederated Tribes Yes Technical Contact johj@yakamafish-nsn.gov (509) 881-1462
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Jackie Olney Yakama Confederated Tribes Yes Administrative Contact olnj@yakamafish-nsn.gov (509) 865-5121x6311
Steve Parker Yakama Confederated Tribes No Supervisor pars@yakamafish-nsn.gov (509) 865-6262x6342
Brandon Rogers Yakama Confederated Tribes Yes Supervisor rogb@yakamafish-nsn.gov (509) 949-4109
Hans Smith Yakama Confederated Tribes Yes Contract Manager h.smith@methownet.com (509) 449-2750
Matt Wilberding Yakama Confederated Tribes Yes Technical Contact wilm@yakamafish-nsn.gov (509) 881-7091


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Complete Engineered Construction Plans B: 175. Big Valley South Design Phases 3&4 2012-101 04/15/2015 04/15/2015
Upper Methow Reach Assessment Report and Data Deliverables E: 115. Upper Methow Reach Assessment 2014-116 12/31/2015 12/31/2015
Side Channel Restoration and Enhancement F: 30. Fender Mill Side Channel Construction 2010-33 12/31/2015 12/31/2015
Restore horse pasture where alluvial spoils are stored G: 98. M2 1890s Side Channel Restoration Field Repair - 2011-65 08/15/2015 08/15/2015
Design reports/models and various plan percentage based plan sets H: 175. Early Winters Creek - Twenty Below Restoration Design 2014-117 12/31/2015
Design reports/models, outreach materials and various plan percentage based plan sets K: 175. Upper Stillwaters Design #2 2013-107 12/31/2015
Design reports/models, outreach materials and various plan percentage based plan sets L: 175. Upper Stillwaters Design #3 2013-108 12/31/2015
Chewuch River Right Design Work M: 175. Chewuch River Right Design 2011-74 12/31/2015 12/31/2015
Construct the Chewuch River Right Project N: 30. Chewuch River Right Construction 2011-74 12/31/2015 12/31/2015
Chewuch Camp Ground Design Work O: 175. Chewuch Camp Ground Design 2012-96B 12/31/2015 12/31/2015
Construct the Chewuch Camp Ground Project P: 29. Chewuch Camp Ground Construction 2012-96B 12/31/2015 12/31/2015
Chewuch Camp Ground Design Work Q: 175. Chewuch River Mile 13-.15.5 Design 2012-96 12/31/2015 12/31/2015
Construct the Chewuch River Mile 13-15.5 Project R: 29. Chewuch River Mile 13-15.5 Construction 2012-96 12/31/2015 07/31/2015
8 Mile Creek Reconnaissance S: 115. 8 Mile Creek Barrier Review and Reconnaissance 2014-120 12/31/2015 12/31/2015
All administrative tasks fulfilled with timely quality products T: 119. Perform project management and administrative duties 12/31/2015 12/31/2015
Assist BPA in producing Environmental Compliance documents W: 165. Environmental Compliance (Covered under personnel contract CR-273752) 12/31/2015 12/31/2015
Continue the USFS NEPA process for public review of the Chewuch habitat Restoration projects X: 165. CCR-33830/Mod. 1 Chewuch River USFS NEPA Process 2014-126 12/31/2015 12/31/2015
Lower Wenatchee River Reach Assessment Report Y: 115. CCR-33830/Mod. 1 Lower Wenatchee Reach Assessment - 2014-121 12/31/2015 12/31/2015
Lower Wenatchee Public Outreach Z: 99. CCR-33830/Mod. 1 Lower Wenatchee Public Outreach - 2012-98 12/31/2015 12/31/2015
Complete the USFS NEPA process for the Stormy Project Area A in the Entiat Watershed AA: 165. CCR-33830/Mod. 1 Entiat Stormy A USFS NEPA Process 2014-125 12/31/2015
Complete the USFS NEPA process for projects in the Entiat Watershed AB: 165. CCR-33830/Mod. 1 Entiat Upper Stillwaters USFS NEPA Process 2013-109 12/31/2015
Groups 2&3 LWP Plans suitable for construction AC: 175. CCR-33830/Mod. 1 Groups 2&3 LWP Habitat Restoration Design-2012-99 12/01/2015 12/31/2015
Models, outreach materials, and various plan percentage based plan sets AD: 175. CCR-33830/Mod. 1 Meacham Flats Habitat Restoration Design - 2012-102 12/31/2015 12/31/2015
Implementation of UWP Reaches 3&4 Project AE: 29. CCR-33830/Mod. 1 UWP Reach 3 & 4 Construction 2011-70 12/18/2015 08/07/2015
Complete design Phases 4-6 for the Natapoc Habitat Enhancement Project AF: 175. CCR-33830/Mod. 1 Natapoc Design Phases 4-6 LWM Option 2010-53 09/30/2015 09/30/2015
Construct the Natapoc Habitat Enhancement Project AG: 29. CCR-33830/Mod. 1 Natapoc Construction LWM Option 2014-119 07/31/2015 07/31/2015
Design reports/models, outreach materials and construction plan AH: 175. CCR-33830/Mod. 1 Twisp Horseshoe Side Channel Design (RM 11.5) 2010-39 12/31/2015
Design reports/models, outreach materials and construction plan AI: 175. CCR-33830/Mod. 1 Twisp Ponds Left Bank Side Channel Design 2010-54 12/31/2015
Design reports/models, outreach materials and construction plan AJ: 175. CCR-33830/Mod. 1 Newby Narrows Project Design 2015-126 12/31/2015 12/31/2015
Design reports/models, outreach materials and construction plan AK: 175. CCR-33830/Mod. 1 Lower Twisp River Large Wood Project Design 2015-127 12/31/2015 12/31/2015

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 4 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 4 instances of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 98 Other
  • 3 instances of WE 115 Produce Inventory or Assessment
  • 15 instances of WE 175 Produce Design
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 115 Produce Inventory or Assessment
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 4 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 4 instances of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 98 Other
  • 3 instances of WE 115 Produce Inventory or Assessment
  • 14 instances of WE 175 Produce Design
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 10/01/2014
B 175 Big Valley South Design Phases 3&4 2012-101 10/01/2014
C 180 Big Valley South Structure Removal 2012-101
D 30 Big Valley South Side Channel Reconnection and Habitat Complexity 2012-101
E 115 Upper Methow Reach Assessment 2014-116 10/01/2014
F 30 Fender Mill Side Channel Construction 2010-33 07/01/2015
G 98 M2 1890s Side Channel Restoration Field Repair - 2011-65 10/01/2014
H 175 Early Winters Creek - Twenty Below Restoration Design 2014-117 10/01/2014
I 30 Natapoc Construction 2014-119
J 175 Upper Stillwaters Design #1 2013-106 10/01/2014
K 175 Upper Stillwaters Design #2 2013-107 10/01/2014
L 175 Upper Stillwaters Design #3 2013-108 10/01/2014
M 175 Chewuch River Right Design 2011-74 10/01/2014
N 30 Chewuch River Right Construction 2011-74 04/30/2015
O 175 Chewuch Camp Ground Design 2012-96B 10/01/2014
P 29 Chewuch Camp Ground Construction 2012-96B 06/08/2015
Q 175 Chewuch River Mile 13-.15.5 Design 2012-96 10/01/2014
R 29 Chewuch River Mile 13-15.5 Construction 2012-96 06/08/2015
S 115 8 Mile Creek Barrier Review and Reconnaissance 2014-120 10/01/2014
T 119 Perform project management and administrative duties 10/01/2014
U 132 Submit Progress Report for the period (OCT 2013) to (DEC 2014) 10/01/2014
V 132 Submit Progress Report for the period (OCT 2012) to (Oct 2013) 10/01/2014
W 165 Environmental Compliance (Covered under personnel contract CR-273752) 10/01/2014
X 165 CCR-33830/Mod. 1 Chewuch River USFS NEPA Process 2014-126 10/01/2014
Y 115 CCR-33830/Mod. 1 Lower Wenatchee Reach Assessment - 2014-121 10/01/2014
Z 99 CCR-33830/Mod. 1 Lower Wenatchee Public Outreach - 2012-98 10/01/2014
AA 165 CCR-33830/Mod. 1 Entiat Stormy A USFS NEPA Process 2014-125 10/01/2014
AB 165 CCR-33830/Mod. 1 Entiat Upper Stillwaters USFS NEPA Process 2013-109 10/01/2014
AC 175 CCR-33830/Mod. 1 Groups 2&3 LWP Habitat Restoration Design-2012-99 10/01/2014
AD 175 CCR-33830/Mod. 1 Meacham Flats Habitat Restoration Design - 2012-102 10/01/2014
AE 29 CCR-33830/Mod. 1 UWP Reach 3 & 4 Construction 2011-70 04/08/2015
AF 175 CCR-33830/Mod. 1 Natapoc Design Phases 4-6 LWM Option 2010-53 10/01/2014
AG 29 CCR-33830/Mod. 1 Natapoc Construction LWM Option 2014-119 12/11/2015
AH 175 CCR-33830/Mod. 1 Twisp Horseshoe Side Channel Design (RM 11.5) 2010-39 10/01/2014
AI 175 CCR-33830/Mod. 1 Twisp Ponds Left Bank Side Channel Design 2010-54 10/01/2014
AJ 175 CCR-33830/Mod. 1 Newby Narrows Project Design 2015-126 10/01/2014
AK 175 CCR-33830/Mod. 1 Lower Twisp River Large Wood Project Design 2015-127 10/01/2014